1. Basili, V., and Rombach, H.D., 1989, The TAME project: Towards improvement-oriented software environments. IEEE Transactions on Software Engineering, 14(6): 758–773.
2. Briand, L., Morasca, S., and Basili, V., 2002, An operational process for goal-driven definition of measures. IEEE Transactions on Software Engineering, 28(12): 1106–1125.
3. CMMI, 2002, Capability Maturity Model Integration, Version 1.1, CMMISM for Software Engineering (CMMI-SW, V. 1.1) Staged Representation CMU/SEI-2002-TR-029, CMMI Product Team, SEI Carnegie Mellon University (available online).
4. Dujmovic, J., 1996, A method for evaluation and selection of complex hardware and software systems. Proceedings 22nd International Conference for the Resource Management and Performance Evaluation of Enterprise CS(CMG 96), Vol. 1, pp. 368–378.
5. Goethert, W., and Fisher, M., 2003, Deriving enterprise-based measures using the balanced scorecard and goal-driven measurement techniques. Software Engineering Measurement and Analysis Initiative, CMU/SEI-2003-TN-024 (available online).