Author:
Ismail M. A.,ElMaraghy Hoda A.
Reference45 articles.
1. Asl F.M. and Ulsoy A.G., 2002, Capacity management in reconfigurable manufacturing systems with stochastic market demand, American Society of Mechanical Engineers. 13:567--574
2. Berry, W. L. and T. Hill (1992). "Linking systems to strategy." International Journal of Operations & Production Management 12(10): 3-15
3. Berry, W. L. and T. Hill (1992). "Linking systems to strategy." International Journal of Operations & Production Management 12(10): 3-15
4. Box D., 1998, Essential COM, Addison-Wesley Professional
5. Brockwell P.J. and Davis R.A., 2003, Introduction to Time Series and Forecasting Springer; 2nd ed. 2002. Corr. 2nd printing edition
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献