Author:
Sharma Kamal,Trivedi Manoj Kumar
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference55 articles.
1. Afshar, A., and H. R. Z. Dolabi. (2014). Multi-objective optimization of time-cost-safety using genetic algorithm. International Journal of Optimization in Civil Engineering
2. Afshar, A., Kaveh, A., & Shoghli, O. R. (2007). Multi-objective optimization of time-cost-quality using multi-colony ant algorithm. Fuzzy Sets and Systems, 8(2), 113–124.
3. Agdas, D., Warne, D. J., Osio-Norgaard, J., & Masters, F. J. (2018). Utility of genetic algorithms for solving large-scale construction time-cost trade-off problems. Journal of Computing in Civil Engineering. https://doi.org/10.1061/(asce)cp.1943-5487.0000718
4. Babu, A. J. G., & Suresh, N. (1996). Project management with time, cost, and quality considerations. European Journal of Operational Research. https://doi.org/10.1016/0377-2217(94)00202-9
5. Banihashemi, S. A., Khalilzadeh, M., Zavadskas, E. K., & Antucheviciene, J. (2021). Investigating the environmental impacts of construction projects in time-cost trade-off project scheduling problems with cocoso multi-criteria decision-making method. Sustainability (switzerland). https://doi.org/10.3390/su131910922
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献