Author:
Srimathi K. R.,Padmarekha A.,Anandh K. S.
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference34 articles.
1. Agdas, D., Warne, D. J., Osio-Norgaard, J., & Masters, F. J. (2018). Utility of genetic algorithms for solving large-scale construction time-cost trade-off problems. Journal of Computing in Civil Engineering, 32(1), 04017072.
2. Afshar, A., Kaveh, A., & Shoghli, O. R. (2007). Multi-objective optimization of time-cost-quality using multi-colony ant algorithm.
3. Albadr, M. A., Tiun, S., Ayob, M., & Al-Dhief, F. (2020). Genetic algorithm based on natural selection theory for optimization problems. Symmetry, 12(11), 1758.
4. Alcaraz, J., & Maroto, C. (2001). A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research, 102(1), 83.
5. Bagshaw, K. B. (2021). PERT and CPM in project management with practical examples. American Journal of Operations Research, 11(4), 215–226.