Author:
Krishnamoorthy Mohan,Ernst Andreas T.
Reference30 articles.
1. Arkin, M. and Silverberg, B. (1987). Scheduling jobs with fixed start and end times. Discrete Applied Mathematics, Vol. 18, pp. 1–8.
2. Bazaara, M. S. and Goode, J. J. (1979). A survey of various tactics for generating lagrangian multipliers in the context of lagrangian duality. European Journal of Operations Research, Vol. 3, pp. 322–338.
3. Beasley, J. E. (1993). Modern Heuristic Techniques for Combinatorial Problems, C.R.Reeves (Ed.). Oxford: Blackwell Scientific Publications.
4. Carter, M. W. and Tovey, C. A. (1992). When is the classroom assignment problem hard? Operations Research, Vol. 40, pp. 28–39.
5. Dijkstra, M. C, Kroon, L. G., van Nunen, J. A. E. E. and Salomon, M. (1991). A DSS for capacity planning of aircraft maintenance personnel. International Journal of Production Economics, 23, 69–78.
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献