1. Caramanis, M., A. Sharifnia, J. Hu and S. Gershwin, 1991, “Development of a Science Base for Planning and Scheduling Manufacturing Systems” in Proceedings ofthe 1991 NSF Design and Manufacturing Systems Conference, Austin, Texas, 27–40.
2. Chase, C. and P. Ramadge, 1992, “On Real-Time Scheduling Policies for Flexible Manufacturing Systems”, IEEE Transactions on Automatic Control, 37(4), 491–496.
3. Connolly, S., Y. Dallery and S. Gershwin, 1992, “A Real-time Policy for Performing Setup Changes in a Manufacturing System”, in Proceedings of the 31
st
IFEE
Conference on Decision and Control
, Tucson, Arizona.
4. Dobson, G., 1987, “The Economic Lot Scheduling Problem: Achieving Flexibility Using Time-Varying Lot Sizes”, Operations Research, 35, 764–771.
5. Elhafsi, M. and S. Bai, 1996, “Transient and Steady-State Analysis of a Manufacturing System with Setup Changes”. Journal ofGlobal Optimization, 8, 349–378.