1. Ott HW (2009) Electromagnetic compatibility engineering. John Wiley & Sons, Amsterdam
2. Bao, J.; Sherwood, S.C.; Alexander, L.V.; Evans, J.P. Future increases in extreme precipitation exceed observed scaling rates. Nat. Clim. Chang. 2017, 7, 128–132. https://doi.org/10.1038/nclimate3201
3. Schaeffner M et al. (2021) Analysis, quantification and evaluation of uncertainty. “ In: Pelz, P.F., Groche, P., Pfetsch, M.E., Schaeffner, M. (eds) Mastering Uncertainty in Mechanical Engineering. Springer Tracts in Mechanical Engineering. Springer, Cham.
4. Musso L, Berat V, Canavero F, Demoulin B. et al. “A plane wave Monte Carlo simulation method for reverberation chambers. In: EMC Europe 2002, international symposium on electromagnetic compatibility. 2002. Pp 45–50
5. Monsef F, Cozza A (2015) A possible minimum relevance requirement for a statistical approach in a reverberation chamber. IEEE Trans Electromagn Compat 57(6):1728–1731. https://doi.org/10.1109/TEMC.2015.2464318