Author:
Chen Bo,Deng Xiaotie,Zang Wenan
Publisher
Springer Berlin Heidelberg
Reference16 articles.
1. P. Brucker, A. Gladky, H. Hoogeveen, M.Y. Kovalyov, C.N. Potts, T. Tautenhahn, and S.L. Van de Velde, Scheduling a Batching Machine, Journal of Scheduling
1 (1998), 31–54.
2. Lect Notes Comput Sci;S. Chakrabarti,1996
3. V. Chandru, C.-Y. Lee and R. Uzsoy, Minimizing total completion time on batch processing machines, International Journal of Production Research
31 (1993), 2097–2121.
4. V. Chandru, C.-Y. Lee and R. Uzsoy, Minimizing total completion time on a batch processing machine with job families, Operations Research Letters
13 (1993), 61–65.
5. X. Deng, H. Feng, G. Li, G. Liu, A PTAS for minimizing total flow-time of bounded batch scheduling, unpublished manuscript.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献