Author:
Bernat Guillem,Burns Alan
Publisher
Springer Berlin Heidelberg
Reference20 articles.
1. S. Baruah, G. Koren, D. Mao, B. Mishra, A. Raghunathan, L. Rosier, D. Shasha, and F. Wang. On the competitiveness of online real-time task scheduling. Real-Time Systems, 4(2):124–144, 1992.
2. G. Bernat and A. Burns. Combining (n m)-hard deadlines with dual priority scheduling. In Proceedings of 18th IEEE Real-Time systems symposium. San Francisco, CA, December 1997.
3. S. Biyabani, J.A. Stankovic, and K. Ramamritham. The integration of criticalness and deadlines in scheduling real-time tasks. In Proceedings of the 9th IEEE Real-Time Systems Symposium, pages 152–169, 1988.
4. G. Buttazzo, M. Spuri, and F. Sensini. Value vs. deadline scheduling in overload conditions. In Proceedings of the IEEE Real-Time Systems Symposium, 1995.
5. G. Buttazzo and J. Stankovic. RED: A robust earliest deadline scheduling algorithm. In Proceedings of the 3rd International Workshop on Responsive Computer Systems, Austin, 1993.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Programming Languages for Real-Time Systems;Embedded Systems Design;2005
2. Real-Time Scheduling;Embedded Systems Design;2005
3. Task attribute-based scheduling;ACM SIGAda Ada Letters;2003-12