Funder
National Key Research & Development Program of China
National Natural Science Foundation of China
Publisher
Springer Science and Business Media LLC
Subject
Safety, Risk, Reliability and Quality,Civil and Structural Engineering
Reference53 articles.
1. Yang F, Cao SR, Qin G (2018) Mechanical behavior of two kinds of prestressed composite linings: A case study of the Yellow River Crossing Tunnel in China. Tunn Undergr Space Technol 79:96–109
2. Xu ZG, Xian MT, Li XF, Zhou W, Wang JM, Wang YP, Chai JR (2021) Risk assessment of water inrush in karst shallow tunnel with stable surface water supply: Case study. Geomechan Eng 25:495–508
3. Panthi KK, Basnet CB (2019) Evaluation of earthquake impact on magnitude of the minimum principal stress along a shotcrete lined pressure tunnel in Nepal. J Rock Mech Geotech Eng 11:920–934
4. Farhadian H, Hassani AN, Katibeh H (2017) Groundwater inflow assessment to Karaj water conveyance tunnel, Northern Iran. KSCE J Civ Eng 21:2429–2438
5. Dabling M, Lambson D (2018) Olmsted flowline seismic retrofit. Pipelines Conference, Toronto, Canada, 135–141.