Author:
Wang Jinchao,Liu Houcheng
Funder
National Natural Science Foundation for the Youth of China
State Key Laboratory of Metal Material for Marine Equipment and Application
Publisher
Springer Science and Business Media LLC
Subject
Safety, Risk, Reliability and Quality,Civil and Structural Engineering
Reference23 articles.
1. Li L, Li JP, Yue ZW (2016) Study on mechanical mechanism of borehole wall stability of bored cast-in-place pile in saturated clay. Geotech Mech 37(09):2496–2504. https://doi.org/10.16285/j.rsm.2016.09.009
2. Zhang RY, Zhang HY (2018) Application of bored cast-in-place pile technology in housing construction. Residential and real estate 24:181
3. Shen JH, Liu HQ, Yang Y (2015) borehole forming quality inspection of large diameter and super long bored pile. Highway Transport Technol (Appl Technol Edn) 11(11):167–169
4. Peng BJ (2016) Study on retaining wall design method of manual borehole digging pile considering borehole channeling effect. Geol Explor 52(02):307–315
5. Wei YG (2016) Discussion on treatment method of retaining wall collapse of manual borehole digging pile. Eng Construct Design 7:167–168172. https://doi.org/10.13616/j.cnki.gcjsysj.2016.07.045