1. Zheng J, Wang J (2018) Concrete-filled steel tube arch bridges in China. Engineering 4:143–155. https://doi.org/10.1016/j.eng.2017.12.003
2. Zheng J, Du H, Mu T, Liu J, Qin D, Mei G, Tu B (2022) Innovations in design, construction, and management of Pingnan third bridge—the largest-span arch bridge in the world. Struct Eng Int 32:134–141. https://doi.org/10.1080/10168664.2021.1956399
3. Qin D, Zheng J, Du H, Han Y, Zheng J, Wei L (2020) Optimization calculation method for stayed-buckle cable force under one-time tension by fastening stay method and its application. China Railw Sci 41:52–60 (in Chinese)
4. Hao N, Gu A (2015) Construction control of 500 m scale concrete- filled steel tubular arch bridge. J Southwest Jiaotong Univ 50:635–640 (in Chinese)
5. Yao G, Chao Y, Wu H, Qu H (2017) Construction control of hoisting and installation of arch rib of a half-through CFST stiff skeleton arch bridge. Bridge Constr 47:107–111 (in Chinese)