Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Industrial and Manufacturing Engineering,Software
Reference25 articles.
1. Adiri, I. and Aizikowitz, N. (1987) Open shop scheduling problems with dominated machines,Operations Research, Statistics and Economics Mimeograph Series No. 383, Technion, Israel.
2. Adiri, I. and Amit, N. (1984) Openshop and flowshop scheduling to minimize sum of completion times.Computers and Operations Research,11, 275?84.
3. Askin, R. G. and Subramanian, S. P. (1987) A cost based heuristic for group technology configuration.International Journal of Production Research,25, 101?13.
4. Ben-Arieh, D. and Dror, M. (1989) Group scheduling using group technology concept.International Journal of Computer Integrated Manufacturing,2, 186?93.
5. Ben-Arieh, D., Moodie, C. L. and Chu, C. C. (1988) Control methodology for FMS.IEEE Journal of Robotics and Automation,4, 53?9.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献