1. American Petroleum Institute. 1996API Coke Drum Survey Final Report. 2003
2. Ramos A, Rios C C, Vargas J, et al. Mechanical integrity evaluation of delayed Coke drums. In: Proceedings of ASME 1997 Pressure Vessels and Piping Conference on Fitness for Adverse Environments in Petroleum and Power Equipment. 1997, 359: 291–298
3. Ramos A, Rios C C, Johnsen E, et al. Delayed coke drum assessment using field measurements & FEA. In: Proceedings of ASME/JSME 1998 Joint Pressure Vessels and Piping Conference on Analysis and Design of Composite, Process, and Power Piping and Vessels. 1998, 368: 231–237
4. Oka M, Ambarita H, Daimaruya M, et al. Initiation of bulges in a coke drum subjected to cyclic heating and cooling, also cyclic mechanical loads. Journal of Thermal Stresses, 2010, 33(10): 964–976
5. Yan Z, Zhang Y, Chen J, et al. Statistical method for the fatigue life estimation of coke drums. Engineering Failure Analysis, 2015, 48: 259–271