1. M. D. Grossi: NASA Contractor Report NAS 8-28203, May 11, 1973.
2. G. Colombo, E. M. Gaposchkin, M. D. Grossi andG. L. Weiffenbach:Smithson. Astrophys. Observatory, Rep. Geoastron.,1 September issue (1974).
3. Tethered Satellite System Facility Requirements Definition Team Report, NASA Contract NAS 8-33383, April 1980.
4. M. Dobrowolny andE. Melchioni:J. Geophys. Res.,98, 13761 (1993).
5. P. R. Williamson andP. M. Banks:The Tethered Ballon Generator—a Space Shuttle-Tethered Satellite for Plasma Studies and Power Generation, Utah State University Report, 1976.