Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Hardware and Architecture,Condensed Matter Physics,Electronic, Optical and Magnetic Materials
Reference45 articles.
1. Abraham A, Liu H, Zhang W, Chang T-G (2006) Scheduling jobs on computational grids using fuzzy particle swarm algorithm. In: International Conference on Knowledge-Based and Intelligent Information and Engineering Systems. Springer, pp 500–507
2. Buyya R, Murshed M (2002) Gridsim: a toolkit for the modeling and simulation of distributed resource management and scheduling for grid computing. Concurr Comput Pract Exp 14(13–15):1175–1220
3. Chang R-S, Chang J-S, Lin P-S (2009) An ant algorithm for balanced job scheduling in grids. Future Gener Comput Syst 25(1):20–27
4. Chang R-S, Lin C-Y, Lin C-F (2012) An adaptive scoring job scheduling algorithm for grid computing. Inf Sci 207:79–89
5. Di Martino V (2003) Sub optimal scheduling in a grid using genetic algorithms. In: Proceedings International Parallel and Distributed Processing Symposium. IEEE, Nice, France, p 7
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献