Optimization of coiled tubing nozzle for sand removal from wellbore

Author:

Khan Javed Akbar,Irawan Sonny,Padmanabhan Eswaran,Al-Kayiem Hussain H.,Rai Sahil

Abstract

AbstractProduction is hampered by sand and scale that impede flow and require intervention. Although coiled tubing jetting tools have been very successful in wellbore cleaning operations, the coiled tubing unit has certain limitations and constraints. The fluid pumping pressures of fluids at the wellhead are limited to the normal pressure of pump, whereas some sand types and scales require a very high shear force to break and disintegrate. The dimensions of the coiled tubing unit nozzle size are directly related to the diameter of the production tubing. The present work consists in designing the nozzle of coiled tubing jetting tool with different dimensional parameters and analysing the design of the nozzle for required high outlet pressure, flow rate and velocity at various inlet pressures. Numerical technique was used to analyse the flow of fluid through the nozzle. The different port diameters and cone angles between 0.09 and 0.125 inch and 15° and 45°, respectively, were simulated. The effects of these parameters on the outlet pressure, the mass flow at the outlet and the outlet velocities were predicted and analysed. Inner nozzle diameters smaller than 0.75 inch gave good results, and the 1 inch inner diameter gave lower performance. Therefore, the lower diameter nozzle provides better performance. Decreasing the number of ports from seven to five did not create a big difference in nozzle performance, as the seven ported nozzles provide slightly better performance.

Publisher

Springer Science and Business Media LLC

Subject

General Energy,Geotechnical Engineering and Engineering Geology

Reference15 articles.

1. Afghoul A, Amaravadi S, Boumali A, Calmeto J, Lima J, Lovell J, Tinkham S, Zemlak K, Staal T (1994) Coiled tubing: the next generation. Oilfield Rev 6(4):9–23

2. Ali A, Blount CG, Hill S, Pokhriyal J, Weng X, Loveland MJ, Mokhtar S, Pedota J, Rødsjø M, Rolovic R, Zhou W (2004) Integrated wellbore cleanout systems: improving efficiency and reducing risk. Oilfield Rev 16(1):38–57

3. Connell ML, Courville P and Tucker J (2000) Coiled tubing-deployed jetting tool enhances cleaning and jet cutting. In: SPE/ICoTA coiled tubing roundtable

4. Connell M, Courville P, Tucker J (2000) A coiled tubing-deployed slow-rotating jet cleaning tool enhances cleaning and allows jet cutting of tubulars. In: SPE permian basin oil and gas recovery conference

5. Deng F, Deng J, Yan W, Zhu H, Huang L, Chen Z (2013) The influence of fine particles composition on optimal design of sand control in offshore oilfield. J Pet Explor Prod Technol 3(2):111–118

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3