1. M.F. Cai, M.W. Xie, and C.L. Li, GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit mine, J. Univ. Sci. Technol. Beijing, 14(2007), No. 1, p. 1.
2. M.F. Cai, M.C. He, and D.Y. Liu, Rock Mechanics and Engineering, The Science Press, Beijing, 2002, p. 6.
3. T.H. Yang, F.C. Zhang, Q.L. Yu, M.F. Cai, and H.Z. Li, Research situation of open-pit mining high and steep slope stability and its developing trend, Rock Soil Mech., 32(2011), No. 5, p. 1437.
4. J.I. Adachi, E. Detournay, and A.P. Peirce, Analysis of the classical pseudo-3D model for hydraulic fracture with equilibrium height growth across stress barriers, Int. J. Rock Mech. Min. Sci., 47(2010), No. 4, p. 625.
5. M.F. Cai, L. Qiao, C.H. Li, and J.A. Wang, Stability analysis and design optimization of high and steep slope in Shuichang open-pit mine, J. Univ. Sci. Technol. Beijing, 26(2004), No. 5, p. 465.