1. B. Subba Raju, K. Vijaya Kumar, H. Seetha, T. Jayanthi, S.A.V. Satya Murty, Modeling & simulation of emergency power supply system and emergency transfer scheme for PFBR operator training simulator. Int. Res. J. Eng. Technol. 2(3), 1600–1605 (2015)
2. Instructions Facilities, Standards, and Techniques, “CO2 System Operation and Maintenance” (U.S. Department of the Interior Bureau of Reclamation Denver, Colorado, 2005), pp. 5–12
3. IEEE standard criteria for diesel-generator units applied as standby power supplies for nuclear power generating stations. in IEEE Std 387–1995, pp 1–48 (1996). https://doi.org/10.1109/IEEESTD.1996.80823
4. AERB safety standard, “Fire protection systems for nuclear facilities”. AERB safety standard No. AERB/NF/SS/FPS rev. 1. AERB, Mumbai, India, (2010)
5. Standard for the installation of sprinkler systems. 1999 Edition. National Fire Protection Association (NFPA13), pp. 1–367