Quantitative risk assessment of slope hazards along a section of railway in the Canadian Cordillera—a methodology considering the uncertainty in the results

Author:

Macciotta Renato,Martin C. Derek,Morgenstern Norbert R.,Cruden David M.

Publisher

Springer Science and Business Media LLC

Subject

Geotechnical Engineering and Engineering Geology

Reference46 articles.

1. Australian Geomechanics Society (AGS) (2007) Practice note guidelines for landslide risk management 2007. Aust Geomech 42(1):63–114

2. Australian National Committee on Large Dams (ANCOLD) (2003) Guidelines on risk assessment. Australian National Committee on Large Dams Inc, Melbourne

3. Ayyub BM (2003) Risk Analysis in Engineering and Economics. CRC Press

4. Baecher GB, Christian JT (2003) Reliability and statistics in geotechnical engineering. Wiley, West Sussex, p 605

5. Barney D, Haley D, Nikandros G (2001) Calculating train braking distance. Proceedings of the 6th Australian workshop on Safety Critical Systems and Software, Brisbane, Australia. AustComp Soc 3:23–29

Cited by 58 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3