Author:
Shi Z. M.,Xiong X.,Peng Ming,Zhang L. M.,Xiong Y. F.,Chen H. X.,Zhu Y.
Funder
Natural Science Foundation of China
Shanghai Pujiang Program
the Program for Young Excellent Talents in Tongji University
Publisher
Springer Science and Business Media LLC
Subject
Geotechnical Engineering and Engineering Geology
Reference31 articles.
1. Cai W (2014) 30 soldiers from Armed Police Hydropower Troops took risk mitigation measures for landslide dams in Yunnan. Xhby.net. online: http://js.xhby.net/system/2014/08/08/021583443.shtml (in Chinese)
2. Chang DS, Zhang LM (2010) Simulation of the erosion process of landslide dams due to overtopping considering variations in soil erodibility along depth. Nat Hazards Earth Syst Sci 10(4):933–946
3. Chang ZF, Chen XL, An XW, Cui JW (2015) Why the 2014 Ludian, Yunnan, China Ms 6.5 earthquake triggered an unusually large landslide? Nat Hazards Earth Syst Sci Discuss 3:367–399
4. China Earthquake Administration (2014) China Earthquake Administration released intensity map of Ludian Ms 6.5 earthquake. cea.gov.cn. online: http://www.cea.gov.cn/publish/dizhenj/464/478/20140807085249557322083/index.html . Accessed 07 Aug 2014 (in Chinese)
5. Costa JE, Schuster RL (1988) The formation and failure of natural dams. Geol Soc Am Bull 100(7):1054–1068
Cited by
55 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献