1. W. SIHN (1995) Re-engineering Through Natural Structures: The Fractal Factory. Proc. of the 3rd International Conference: Computer Integrated Manufacturing, 11–14 July 1995, Singapore. J. Winsor, A.I. Sivakumar and R. Gay (Eds.). World Scientific, Singapore, p. 5–13.
2. S. ROBINSON (1994) Successful simulation: A Practical Approach to Simulation. McGraw-Hill, London.
3. J. EFSTATHIOU, A. CALINESCU and J. BERMEJO (1996) Modelling the Complexity of Production Planning and Control. 2nd International Conference on Production Planning and Control in the Metals Industry- Conference Papers, London, November 12–14, p. 60–66.
4. F. BONFATTI, P.D. MONARI and P. PAGANELLI (1995) Modelling Manufacturing Resources and Activities: an Ontology. Proc. of the 3rd International Conf.: Computer Integrated Manufacturing, 11–14 July 1995, Singapore, J. Winsor, A.I. Sivakumar and R. Gay (Eds.). World Scientific, Singapore, p. 101–108.
5. A. LUNG (1995) Develop a Systematic Methodology to Aid Simulation Modelling. Advances in Manufacturing Technology DC. Proceedings of the Eleventh National Conference on Manufacturing Research, De Montfort University, Leicester, 12–14 September 1995, D. Stockton and C. Wainwright (Eds.), p. 408–412.