1. Abdul-Rahman, H., Wang, C., & Siong, E. K. (2012). Knowledge acquisition using psychotherapy technique for critical factors influencing construction project layout planning. Project Management Journal, 43(1), 50–64.
2. Akhavian, R., & Behzadan, A. H. (2014). Evaluation of queuing systems for knowledge-based simulation of construction processes. Automation in Construction, 47, 37–49.
3. Al-Jibouri, S. H., & Mawdesley, M. J. (2002). A knowledge based system for linking information to support decision making in construction. Electronic Journal of Information Technology in Construction, 7, 83–100.
4. Arun, C., & Rao, B. N. (2007). Knowledge based decision support tool for duration and cost overrun analysis of highway construction projects. Journal of the Institution of Engineers (India): Civil Engineering Division, 88, 27–33.
5. Bigliardi, B., Dormio, A. I., & Galati, F. (2010). ICTs and knowledge management: an Italian case study of a construction company. Measuring Business Excellence, 14(3), 16–29.