1. Bai JB, Hou CJ, Huang HF (2004) Numerical simulation study on stability of narrow coal pillar of roadway driving along goaf. China J Rock Mech Eng 23(20):3475–3479 (in Chinese)
2. China National Coal Association (CNCA) (2013) Forum on mining technology of 1000m-plus deep coalmines in China. Taian, China (in Chinese)
3. Fan KG, Liang HG, Ma CS, Zang CW (2014) Non-harmonious deformation controlling of gob-side entry in thin coal seam under dynamic pressure. J Rock Mech Geotech Eng 6:269–274
4. Feng JC, Ma NJ, Zhao ZQ, Zhang H, Yu ZM (2014) Width of narrow coal pillar of roadway driving along goaf at large height mining face in deep mine. J Min Saf Eng 31(4):580–586 (in Chinese)
5. Hou CJ, Ma NJ (1989) Stress in in-seam roadway sides and limit equilibrium zone. J China Coal Soc 4:21–29 (in Chinese)