1. Alber M (2000) Advance rates of hard rock TBMs and their effects on project economics. Tunn Undergr Space Technol 15(1):55–64. https://doi.org/10.1016/S0886-7798(00)00029-8
2. Barton N (1999) TBM performance estimation in rock using QTBM. TunnTunne Int 31(9):30–34
3. Bieniawski ZT, Celada B et al (2006) Rock mass excavability indicator: new way to selecting the optimum tunnel construction method. Tunn Undergr Space Technol 21(3):237–237. https://doi.org/10.1016/j.tust.2005.12.016
4. Bieniawski, Z.T., and Grandori, R. (2008). Predicting TBM excavability – part II. Tunnels and Tunnelling International, 15–18.
5. Chen, B., Feng, X., Xiao, Y., Ming, H., Zhang, C., Hou, J., and Chu, W. (2010). Acoustic emission test on damage evolution of surrounding rock in deep-buried tunnel during TBM excavation. Chinese J Rock Mech Eng 29.