1. Alexander TW (1995) Technique for estimating the 2-to 500-year flood discharges on unregulated streams in rural Missouri, vol 95, no 4231. US Department of the Interior, US Geological Survey
2. Ali S, Cheema MJM, Waqas MM, Waseem M, Leta MK, Qamar MU, Bilal M (2021) Flood mitigation in the transboundary Chenab River basin: a basin-wise approach from flood forecasting to management. Remote Sens 13(19):3916
3. Al-Mashidani G, Lal Pande BB, Fattah Mujda M (1978) A simple version of Gumbel’s method for flood estimation/Version simplifiée de la method de Gumbel pour l’esti- mation des crues. Hydrol Sci Bull 23(3):373–380. https://doi.org/10.1080/02626667809491810
4. Bailey JF (1989) Estimation of flood-frequency characteristics and the effects of urbanization for streams in the Philadelphia, Pennsylvania area, no 87-4194. Department of the Interior, US Geological Survey
5. Bedient PB, Huber WC, Vieux BE (2008) Hydrology and floodplain analysis, vol 816. Prentice Hall, Upper Saddle River, NJ