Funder
Fundamental Research Funds for the Central Universities
Publisher
Springer Science and Business Media LLC
Subject
Applied Mathematics,Computational Mathematics
Reference30 articles.
1. Jackson, J.R.: Scheduling a Production Line to Minimize Maximum Tardiness. Management Science Research Project, UCLA (1955)
2. Wang, X.Y., Wang, M.Z.: Single machine common flow allowance scheduling with a rate-modifying activity. Comput. Indus. Eng. 59(4), 898–902 (2010)
3. Li, S., Ng, C.T., Yuan, J.: Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine. Int. J. Prod. Econ. 131(2), 747–751 (2011)
4. Yin, Y.Q., Cheng, T.C.E., Wu, C.C., Cheng, S.R.: Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity. Int. J. Prod. Res. 52(19), 5583–5596 (2014)
5. Zhao, C., Hsu, C.J., Cheng, S.R., Yin, Y., Wu, C.C.: Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs. Appl. Math. Comput. 248(1), 503–510 (2014)
Cited by
23 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献