Author:
Anilkumar Shyni,Banerji Haimanti
Abstract
AbstractThe 2004 Indian Ocean Tsunami triggered significant destruction to housing and related infrastructures across various coastal districts of south India. Research shows that tsunami reconstruction projects in Kerala experienced different degrees of success and failure. On this background, this study explored factors that contributed to the successful implementation of tsunami housing projects in Kerala by (1) consolidating various critical success factors (CSFs) for post-disaster reconstruction (PDR) projects under “project management success traits” through content analysis of existing literature; (2) deriving a conceptual model that envisages project success in PDR contexts; and (3) assessing the impacts of those success traits on tsunami housing projects using confirmatory factor analysis. Necessary data were gathered through a survey of various stakeholders involved in tsunami reconstruction projects in Kerala using structured questionnaires. The research revealed that PDR project success is attributed to critical dimensions of project management such as institutional mechanisms, reconstruction strategies, project implementation, and stakeholder management. A conceptual model with the interplay of project success, success traits, as well as their CSFs identified the project management actions that must be monitored during reconstruction. Since the project management approach is widely recognized for PDR projects, these success traits hold huge potential for effective organization and management of housing reconstruction projects. The study also helped to identify project management traits that need improvements for the successful implementation of post-disaster housing projects in Kerala. Thus the research findings can serve as a foundational study for formulating project management strategies appropriate to PDR projects in Kerala.
Publisher
Springer Science and Business Media LLC
Subject
Management, Monitoring, Policy and Law,Safety Research,Geography, Planning and Development,Global and Planetary Change
Reference65 articles.
1. Ahmed, I. 2011. An overview of post-disaster permanent housing reconstruction in developing countries. International Journal of Disaster Resilience in the Built Environment 2(2): 148–164.
2. Andrew, S.A., S. Arlikatti, L.C. Long, and J.M. Kendra. 2013. The effect of housing assistance arrangements on household recovery: An empirical test of donor-assisted and owner-driven approaches. Journal of Housing and the Built Environment 28(1): 17–34.
3. Asgary, A., A. Badri, M. Rafieian, and A. Hajinejad. 2006. Lost and used post-disaster development opportunities in Bam earthquake and the role of stakeholders. In Proceedings of the 2006 International Conference and Student Competition on Post-disaster Reconstruction “Meeting Stakeholder Interests”, 17–19 May 2006, Florence, Italy. http://www.grif.umontreal.ca/pages/papersmenu2006.htm. Accessed 10 Dec 2006.
4. Baroudi, B., and R. Rapp. 2011. A project management approach to disaster response and recovery operations. 36th Australasian University Building Educators Association Conference. http://epublications.bond.edu.au/cgi/viewcontent.cgi?article=1001&context=aubea_2011. Accessed 12 Nov 2015.
5. Belassi, W., and O.I. Tukel. 1996. A new framework for determining critical success/failure factors in projects. International Journal of Project Management 14(3): 141–151.
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献