1. Akhavian R, Behzadan A H (2015) Construction equipment activity recognition for simulation input modelling using mobile sensors and machine learning classifiers. Advanced Engineering Informatics 29: 867–877.
2. Ashvin European Union Horizon 2023 Project. https://www.ashvin.eu. Zugriff: 17. Juni 2023.
3. Ballard G (2000) The last planner system of production control. Dissertation. Faculty of Engineering, University of Birmingham, UK.
4. Ballard G, Tommelein I D (2021). 2020 Current process benchmark for the last planner® system of project planning and control (Technical Report, Project Production Systems Laboratory (P2SL)). University of California, Berkeley.
5. Bertelsen S, Koskela L (2003) Avoiding and Managing Chaos in Projects. Proceedings of the 11th Annual Conference of the International Group for Lean Construction, Juli 22–24, Blacksburg, Virginia.