Author:
Frahm Michael,Rahebi Hamid
Publisher
Springer Fachmedien Wiesbaden
Reference28 articles.
1. Ballard, G. H. (2000). The Last Planner System of Production Control (Dissertation ed.). Birmingham: University of Birmingham
2. Berner, F., Kochendörfer, B., & Schach, R. (2013). Grundlagen der Baubetriebslehre 2 – Baubetriebsplanung (2. Auflage ed.). Stuttgart, Berlin, Dresden: Springer Vieweg
3. Binninger, M., Dlouhy, J., & Haghsheno, S. (2017). Technical Takt Planning and Takt Control in Construction. 25th Conference of International Group for Lean Construction (IGLC), (pp. 605–612). Greece
4. Davies, A., Gann, D., & Douglas, T. (2009, 51 02). Innovation in Megaprojects: Systems Integration at London Heathrow Terminal 5. California Management Review, pp. 101–125
5. Demir, S.-T. (2020a, 05 20). Lean Construction in Groß- und Megaprojekten – Erfahrungen aus der Praxis. (H. Rahebi, Interviewer)