1. Hustrulid W, Kuchta M, Martin R (1995) Open pit mine planning & design, 3rd edn. CRC Press, Taylor and Francis Group
2. Mular AL, Poulin R (1998) A handbook for estimating mining and mineral processing equipment costs and capital expenditures and aiding mineral project evaluation, vol 47. Canadian institute of mining, metallurgy and petroleum, Montreal
3. Bagherpour R (2007) Technical and economical optimization of surface mining processes: Development of a data base and a program structure for the computer-based selection and dimensioning of equipment in surface mining operations. Ph.D. Dissertation, Technischen Universität Clausthal
4. Shen L, Muduli K, Barve A (2015) Developing a sustainable development framework in the context of mining industries: AHP approach. Resour Pol 46:15–26
5. Biswas P, Pramanik S, Giri BC (2016) TOPSIS method for multi-attribute group decision-making under single-valued neutrosophic environment. Neural Comput Appl 27(3):727–737