1. Nie X, Chen Y, Meng Y, Yang C, Yan J, Wang Z (2010) Current status and development strategy of managed pressure drilling technology. Drill Prod Technol 02:38–39
2. Yang X, Zhou Y, Fang S, Liu W (2011) Design and laboratory test of hierarchical intelligent control system for managed pressure drilling. Pet Drill Tech 04:13–18
3. Liu W, Shi L, Wang K, Fang S, Guo Q, Yan X, Zhu W (2015) A method for real-time correction of wellbore pressure. China Patent: 201510567464.5
4. Zhang X, Jiang Y, Zhou Y, Liu W, Wang W, Wang K, Yan X (2014) Simulation calculation method for gas-liquid two-phase flow in managed pressure drilling. Chinese Patent: 201410371178.7
5. Davoudi M, Smith JR, Chirinos JE et al (2011) Evaluation of alternative initial responses to kicks taken during managed-pressure drilling. SPE Drill Complet 26(02):169–181