1. Ambrozic T, Turk G (2003) Prediction of subsidence due to underground mining by artificial neural networks. Comput Geosci 29:627–637. doi: 10.1016/S0098-3004(03)00044-X
2. Bauer A (1982) Wall control blasting in open pits. CIM special, vol 30. In: 14th Canadian rock mechanics symposium. Canadian Institute of Mining and Metallurgy, pp 3–10
3. Badal R (1994) Controlled blasting in jointed rocks. Int J Rock Mech Min Sci 31:79–84. doi: 10.1016/0148-9062(94)92317-5
4. Bhandari S (1997) Engineering rock blasting operations. A. A. Balkema, Rotterdam, pp 165–166
5. Bhandari S, Badal R (1990) Relationship of joints orientation with hole spacing parameters in multi-hole blasting. In: 3rd international symposium on rock fragmentation by blasting, Brisbane, Australia, pp 225–231