1. Aki, K. (1965). Maximum likelihood estimate of b in the formula log N = a − b M and its confidence limits. Bulletin of the Earthquake Research Institute, University of Tokyo, 43, 237–239.
2. Baranov, S. V., & Shebalin, P. N. (2016). Forecasting aftershock activity: 1. Adaptive estimates based on the Omori and Gutenberg–Richter laws. Izvestiya-Physics of the Solid Earth, 52(3), 413–431. doi:
10.1134/S1069351316020038
.
3. Baranov, S. V., & Shebalin, P. N. (2017). Forecasting aftershock activity: 2. Estimating the area prone to strong aftershocks. Izvestiya-Physics of the Solid Earth. doi:
10.7868/S0002333717020028
.
4. Bender, B. (1983). Maximum likelihood estimation of b-values for magnitude grouped data. Bulletin of the Seismological Society of America, 73, 831–851.
5. Cattania, C., Hainzl, S., Wang, L., Roth, F., & Enescu, B. (2014). Propagation of Coulomb stress uncertainties in physics-based aftershock models. Journal of Geophysical Research: Solid Earth, 119(10), 7846–7864.