Publisher
Springer Science and Business Media LLC
Subject
Management, Monitoring, Policy and Law,Pollution,General Environmental Science,General Medicine
Reference61 articles.
1. Ames, D. P., & Lall, U. (2008). Developing total maximum daily loads under uncertainty: Decision analysis and the margin of safety. Journal of Contemporary Water Research & Education, 140(1), 37–52.
2. Arora, P., Boyne, D., Slater, J. J., Gupta, A., Brenner, D. R., & Druzdzel, M. J. (2019). Bayesian networks for risk prediction using real-world data: A tool for precision medicine. Value in Health, 22, 439–445. https://doi.org/10.1016/j.jval.2019.01.006
3. Barnes, T., Rumbold, D. G., & Salvato, M. (2006). Caloosahatchee Estuary and Charlotte Harbor Conceptual Model. Final Report to the Southwest Florida Feasibility Team. Retrieved May 20, 2022 from https://www.researchgate.net/publication/335079311_Caloosahatchee_Estuary_And_Charlotte_Harbor_Conceptual_Model
4. Borsuk, M. E., Stow, C. A., & Reckhow, K. H. (2003). Integrated approach to total maximum daily load development for Neuse River Estuary using Bayesian probability network model (Neu-BERN). Journal of Water Resources Planning and Management, 129(4), 271–282.
5. Buzzelli, C., Doering, P., Wan, Y., & Sun, D. (2014). Modeling ecosystem processes with variable freshwater inflow to the Caloosahatchee River Estuary, southwest Florida. II. Nutrient loading, submarine light, and seagrasses. Estuarine, Coastal and Shelf Science, 151, 272–284.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献