1. Angermuller, G. and Hardeck, W. (1987) CAD integrated planning for flexible manufacturing systems with assembly tasks. IEEE CAD Journal, 1822?1826.
2. Conradson, S., Weinstein, M., Wilker, J.S. and Yencho, S.A. (1987) Automated material handling (automated assembly and product design as a system), in IEEE Proceedings of the 8th International Conference on Assembly Automation, pp. 67?68.
3. Ferland, M., O'Shea, J. and Rabemanantsoa, M. (1993) Robotic interface for CAD/CAM integration, in Proceedings of Department of National Defense on Workshop on Advanced Techniques in Knowledge-Based Systems and Robotics, Ottawa, Ontario, Canada.
4. Homen de Mello, L.S. and Sanderson, A.C. (1989) A correct and complete algorithm for the generation of mechanical assembly sequences. IEEE Journal of International Conference on Robotics and Automation, CH2750-8, 56?61.
5. Hurt, J. (1989) A taxonomy of CAD/CAE systems. Manufacturing Review, 2(3), 170?178.