Publisher
Springer Science and Business Media LLC
Subject
Management of Technology and Innovation,Computational Theory and Mathematics,Management Science and Operations Research,Statistics, Probability and Uncertainty,Strategy and Management,Modelling and Simulation,Numerical Analysis
Reference18 articles.
1. Chassiakos, A.P., Samaras, C., and Theodorakopoulos, D. (2000). An Integer Programming Method for CPM Time-Cost Analysis. Computer Modeling in Engineering and Sciences, Vol. 1, No 4, pp. 9–18.
2. Coskunoglu, O. (1984). Optimal Probabilistic Compression of PERT Networks. Journal of Construction Engineering and Management, ASCE, 110(4), 437–446.
3. De, P., Dunne, E.J., Ghosh, J.B., and Wells, C.E. (1995). The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, Vol. 81, pp. 225–238.
4. Elmaghraby, S.E., and Kamburowski, J. (1992). The analysis of activity networks under generalized precedence relations. Management Science, Vol. 38, pp. 1245–1263.
5. Feng, C. W., Liu, L., and Burns, S. A. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering, ASCE, 11(3), 184–189.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献