Author:
Apanaviciene Rasa,Juodis Arvydas
Publisher
Springer Science and Business Media LLC
Subject
Management of Technology and Innovation,Computational Theory and Mathematics,Management Science and Operations Research,Statistics, Probability and Uncertainty,Strategy and Management,Modelling and Simulation,Numerical Analysis
Reference25 articles.
1. Adeli, H., Wu, M. (1998). Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, Vol. 124, No. l, 18–24.
2. Angelides, D.C. (1999). Project management and good technical and business practices. Journal of Management in Engineering, Vol. 15, No. 3, 78–87.
3. Ashley, D.B., Lurie, C. S., and Jaselskis, E. J. (1987). Determinants of construction project success. Project Management Journal, Vol. 18, No. 2, 69–79.
4. Back, W. E. and Moreau, K. A. (2000). Cost and schedule impacts of information management on EPC process. Journal of Management in Engineering, Vol. 16, No. 2, 59–70.
5. Bower, D., Ashby, G., Gerald, K., and Smyk, W. (2002). Incentive Mechanisms for Project Success.” Journal of Management in Engineering, Vol. 18, No. 1, 37–43.