Publisher
Springer Science and Business Media LLC
Reference129 articles.
1. Adamowicz W, Bunch D, Cameron T, Dellaert B, Hanneman M, Keane M, Louviere J, Meyer R, Steenburgh T, Swait J (2008) Behavioural frontiers in choice modelling. Mark Lett 19(3–4):201–213
2. Alcaraz J, Maroto C (2001) A robust genetic algorithm for resource allocation in project scheduling. Ann Oper Res 102:83–109
3. Alcaraz J, Maroto C, Ruiz R (2003) Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. J Oper Res Soc 54(6):614–626
4. Alfares HK (2004) Survey, categorization, and comparison of recent tour scheduling literature. Ann Oper Res 127(1–4):145–175
5. Aoki K, Tagaki H (1997) 3-D CG Lighting with an interactive GA, in: international conference on knowledge-based intelligent electronic systems, proceedings, Bd 1, S 296–301