1. Bell, C. E. and Han, J.,A New Heuristic Solution Method in Resource-Constrained Project Scheduling, Naval Research Logistics, Vol. 38(1991), 315–331.
2. Boctor, Fayez F.,Some efficient multi-heuristic procedures for resource-constrained project scheduling, ejoor, Vol. 49(1990), 3–13.
3. Börger, E.,Berechenbarkeit Komplexität Logik, Vieweg, 1992.
4. Demeulemeester, E. and Herroelen, W.,A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem, mgs, Vol. 38, No. 12(1992), 1803–1818.
5. Demeulemeester, E. and Herroelen, W.,New Benchmark Results for the Resourceconstrained Project Scheduling Problem, mgs, Vol. 43, No. 11(1997), 1485–1492.