Author:
Frutos Mariano,Olivera Ana Carolina,Tohmé Fernando
Publisher
Springer Science and Business Media LLC
Subject
Management Science and Operations Research,General Decision Sciences
Reference35 articles.
1. Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job-shop scheduling. Management Science, 34(3), 391–401.
2. Armentano, V. A., & Scrich, C. R. (2000). Tabu search for minimizing total tardiness in a job-shop. International Journal of Production Economics, 63, 131–140.
3. Binato, S., Hery, W. J., Loewenstern, D. M., & Resende, M. G. C. (2001). A GRASP for job-shop scheduling. In Ribeiro, C. C., & Hansen, P. (Eds.), Essays and surveys in meta-heuristics (pp. 59–80). Boston: Kluwer Academic.
4. Bolat, A., & Yano, C. (1992). Scheduling algorithms to minimize utility work at a single station on paced assembly line. Production Planning and Control, 3(4), 393–405.
5. Cheng, C. C., & Smith, S. F. (1997). Applyng constraint satisfaction techniques to job-shop scheduling. Annals of Operations Research, 70, 327–357.
Cited by
63 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献