1. Bruin, J., & van der Wal, J. (2010a). A cyclic production scheme for multi-item production systems with backlog; Part 1 (Report 2010-018). EURANDOM, Department of Mathematics and Computer Science, Eindhoven University of Technology, The Netherlands.
2. Bruin, J., & van der Wal, J. (2010b). A dynamic control strategy for multi-item production systems with backlog; Part 2 (Report 2010-018). EURANDOM, Department of Mathematics and Computer Science, Eindhoven University of Technology, The Netherlands.
3. Cooke, D. L., & Rohleder, T. R. (2006). Inventory evaluation and product slate management in large-scale continuous process industries. Journal of Operations Management, 24, 235–249.
4. Elhafsi, M., & Bai, S. X. (1997). Optimal and near-optimal control of a two-part-type stochastic manufacturing system with dynamic setups. Production and Operations Management, 6(4), 419–438.
5. Elmaghraby, S. E. (1978). The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24(6), 587–598.