Funder
Grant Agency of the Czech Republic
Publisher
Springer Science and Business Media LLC
Subject
Management Science and Operations Research,General Decision Sciences
Reference32 articles.
1. Artigues, C., & Briand, C. (2009). The resource-constrained activity insertion problem with minimum and maximum time lags. Journal of Scheduling, 12(5), 447–460.
2. Ballestín, F., Barrios, A., & Valls, V. (2011). An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags. Journal of Scheduling, 14(4), 391–406.
3. Bartels, J. H., Gather, T., & Zimmermann, J. (2011). Dismantling of nuclear power plants at optimal NPV. Annals of Operations Research, 186(1), 407–427.
4. Behrmann, G., Brinksma, E., Hendriks, M., Mader, A. (2005). Production scheduling by reachability analysis - a case study. In: Workshop on parallel and distributed real-time systems, p. 140. IEEE Computer Society Press.
5. Brucker, P., Hilbig, T., & Hurink, J. (1999). A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags. Discrete Applied Mathematics, 94(1–3), 77–99.
Cited by
20 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献