1. Avesani, P., Perini, A., & Ricci, F. (2000). Interactive case-based planning for forest fire management. Applied Intelligence, 13(1), 41–57.
2. Bacchus, F., & Ady, M. (2001). Planning with resources and concurrency. A forward chaining approach. In IJCAI’01.
3. Bartõk, R., & Mecl, R. (2003). Integrating planning into production scheduling: Visopt shopfloor system. In G. Kendall, E. Burke & S. Petrovic (Eds.), Proceedings of the 1st multidisciplinary international conference on scheduling: theory and applications (MISTA) (pp. 259–278).
4. Bienkowski, M. (1995). Demonstrating the operational feasibility of new technologies: the ARPI IFDs. IEEE Expert, 10(1), 27–33.
5. Biundo, S., & Schattenberg, B. (2001). From abstract crisis to concrete relief—a preliminary report on combining state abstraction and htn planning. In 6th European conference on planning (ECP-01).