1. Allahverdi, A., Gupta, J. N., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, 27(2), 219–239.
2. Amrani, H., Martel, A., Zufferey, N., & Makeeva, P. (2011). A variable neighborhood search heuristic for the design of multicommodity production–distribution networks with alternative facility configurations. OR Spectrum, 33(4), 989–1007.
3. Azoury, K. S., & Miyaoka, J. (2013). Managing production and distribution for supply chains in the processed food industry. Production and Operations Management, 22(5), 1250–1268.
4. Bard, J. F., & Nananukul, N. (2009). The integrated production–inventory–distribution–routing problem. Journal of Scheduling, 12(3), 257–280.
5. Bartal, Y., Leonardi, S., Marchetti-Spaccamela, A., Sgall, J., Stougie, L. (1996). Multiprocessor scheduling with rejection. In: Proceedings of the seventh annual ACM-SIAM symposium on discrete algorithms (SODA’ 96). Philadelphia, USA.