1. Azaron, A., Katagiri, H., & Sakawa, M. (2007). Time-cost trade-off via optimal control theory in Markov PERT networks. Annals of Operations Research, 150, 47–64.
2. Ben-Yair, A. (2010). Upon implementing the beta distribution in project management (Working paper). Department of Industrial Engineering and Management, Negev Academic College of Engineering, Israel. http://braude.ort.org.il/industrial/13thconf/html/.%5Cfiles%5C113_p.pdf .
3. Bowman, R. A. (2007). Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters. Journal of the Operational Research Society, 58, 1354–1360.
4. Callejón, J., Pérez, E., & Ramos, A. (1996). La distribución trapezoidal como modelo probabilístico para la metodología PERT. In X reunión anual ASEPELT-España, Albacete (Spain).
5. Chapman, C., & Ward, S. (2003). Constructively simple estimating: a project management example. Journal of the Operational Research Society, 54, 1050–1058.