Funder
Ministère de l’Enseignement Supérieur et de la Recherche Scientifique
Publisher
Springer Science and Business Media LLC
Reference66 articles.
1. Abu Bakar, M., Bakhuet, A.-J., Kamil, F., Kalaf, B., Abbas, I., & Lee, L. S. (2016). Enhanced simulated annealing for solving aggregate production planning. Math-Ematical Problems in Engineering, 2016, 1–9. https://doi.org/10.1155/2016/1679315
2. Aguirre, A. M., Liu, S., & Papageorgiou, L. G. (2017). Mixed integer linear programming based approaches for medium-term planning and scheduling in multiproduct multistage continuous plants. Industrial & Engineering Chemistry Research, 56, 5636–5651. https://doi.org/10.1021/acs.iecr.6b04958
3. Al-E-Hashem, S. M. J. M., Aryanezhad, M.-B., & Sadjadi, S. J. (2012). An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment. The International Journal of Advanced Manufacturing Technology, 58, 765–782. https://doi.org/10.1007/s00170-011-3396-1
4. Al-gazaly, N., Yousif, N., Atiyah, B., & Zenad, J. (2020). Hybrid heuristics methods to solve app problems in industrial management techniques. Productivity Management, 25, 506.
5. Andersson, H., Fagerholt, K., & Hobbesland, K. (2015). Integrated maritime fleet deployment and speed optimization: Case study from roro shipping. Computers Operations Research, 55, 233–240. https://doi.org/10.1016/j.cor.2014.03.017