Author:
Gebennini Elisa,Grassi Andrea,Fantuzzi Cesare,Gershwin Stanley B.,Schick Irvin Cemil
Publisher
Springer Science and Business Media LLC
Subject
Management Science and Operations Research,General Decision Sciences
Reference43 articles.
1. Altiok, T. M., & Stidham, S. (1983). The allocation of interstage buffer capacities in production lines. IIE Transactions, 15(4), 292–299.
2. Berman, O. (1982). Efficiency and production rate of a transfer line with two machines and a finite storage buffer. European Journal of Operational Research, 9, 295–308.
3. Bulgak, A. A., Diwan, P. D., & Inozu, B. (1995). Buffer size optimization in asynchronous assembly systems using genetic algorithms. Computers & Industrial Engineering, 28, 309–322.
4. Burman, M. H. (1995). New results in flow line analysis. Ph.D. thesis, Department of Electrical Engineering and Computer Science, Massachusetts Institute of Technology.
5. Buzacott, J. A. (1967). Markov chain analysis of automatic transfer line with buffer stock. Ph.D. thesis, University of Birmingham.
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献