Author:
Abou Kasm Omar,Diabat Ali,Cheng T. C. E.
Publisher
Springer Science and Business Media LLC
Subject
Management Science and Operations Research,General Decision Sciences
Reference30 articles.
1. Abou Kasm, O. & Diabat, A. (2019). The quay crane scheduling problem with non-crossing and safety clearance constraints: An exact solution approach. Computers & Operations Research (in press).
2. Abu Dhabi Ports. (2018). Abu Dhabi terminal. Retrieved October 4, 2018, from
https://www.adports.ae/gallery_posts/abu-dhabi-terminal/
.
3. Agra, A., & Oliveira, M. (2018). MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem. European Journal of Operational Research, 264(1), 138–148.
4. Aras, N., Trkoullar, Y., Takn, Z. C., & Altnel, K. (2014). Simultaneous optimization of berth allocation, quay crane assignment and quay crane scheduling problems in container terminals. In Operations Research Proceedings 2012 (pp. 101–107). Springer, Cham.
5. Al-Dhaheri, N., & Diabat, A. (2017). A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints. Annals of Operations Research, 248(1–2), 1–24.
Cited by
32 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献