Author:
Wang Jun,Sun Weizhuo,Shou Wenchi,Wang Xiangyu,Wu Changzhi,Chong Heap-Yih,Liu Yan,Sun Cenfei
Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Artificial Intelligence,Industrial and Manufacturing Engineering,Mechanical Engineering,Control and Systems Engineering,Software
Reference64 articles.
1. Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K.: A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 15 (2), 124–138 (2006)
2. Dong, A., Maher, M.L., Kim, M.J., Gu, N., Wang, X.: Construction defect management using a telematic digital workbench. Autom. Constr. 18 (6), 814–824 (2009)
3. Patterson, L., Ledbetter, W.: The cost of quality: A management tool. Excellence in the Constructed Project, ASCE (1989)
4. Josephson, P.-E., Hammarlund, Y.: The causes and costs of defects in construction: A study of seven building projects. Autom. Constr. 8 (6), 681–687 (1999)
5. Tang, P., Anil, E., Akinci, B., Huber, D.: Efficient and Effective Quality Assessment of As-Is Building Information Models and 3D Laser-Scanned Data. Computing in Civil Engineering (2011). Am. Soc. Civ. Eng., 486–493 (2011)
Cited by
111 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献